How to handle a client decision that arrives after a new proof
Deadlines and inboxes do not move in the same order. A client can return version 2 after the studio has already sent version 3. Keep the late reply as real history without letting it become a decision on work the client did not see.
Start here
A late review is a reply that arrives after you have already issued another version.
Before you start: Open both files and the original reply side by side. First work out which file the reviewer actually saw.
Decide whether a late reply changes the current proof
- Read the attachment name, quoted text or linked revision before interpreting the comment. If you cannot tell which revision it refers to, ask rather than silently attaching it to the latest.
- Classify the feedback: already reflected, still relevant, or ambiguous. Keep it against the original revision and compare the exact issue to the current file.
- If the feedback affects the current proof, make or commission the revision and request the next decision. Carry forward the idea, not the earlier approval.
Fictional example: a reply arrives after v5
10:10, v4 reply: “Approved if the footer date is Friday.”
v5 already corrects the date, but also moves the sponsor logo.
Record the v4 reply against v4. Send v5 to the reviewer, noting the date correction and asking separately about the revised layout.
Check before you move on: Keep a trace of what was seen. A late approval only establishes the scope of whatever was actually reviewed.
Check what the reply points to
Find the revision printed on the review or returned decision. If the client says only “Approved,” use your normal channel to clarify which file they saw before recording a decision. A timestamp after the latest send is not enough to establish the version.
For example, a client opens a saved version 2 flyer and approves it on Tuesday, after the studio sent version 3 on Monday. The Tuesday reply belongs to version 2. The current proof’s status remains awaiting decision.
Keep both versions visible to the studio
Record the late response on the original revision. On the current one, add a short studio note or remind the reviewer which version still needs a decision through your usual process. Do not silently overwrite the previous proof or mark it rejected just because a newer one exists.
If the newer revision only changes a detail, it still contains something the reviewer has not seen. Call that change out in your next message rather than transferring the prior approval.
Save the evidence without overstating it
Proofroom imports the client’s decision file against the stored revision and saves a receipt. Keep the receipt beside the proof files in your usual archive. The recorded name is not independently verified; use your normal trusted channel to establish who sent it.
See the workflow in practice
See the Proofroom app screenshots. The example uses fictional information.