Free renovation starter kit
Plan one job, shortlist a builder and compare two quotes on the same scope. Print this page or save it as a one-page A4 worksheet using your browser’s Print command. No account, email or upload.
RenoCue · Renovation starter worksheet
Planning and discussion only. Confirm requirements for your address before committing.
1. Plan the job
Write the problem you want to fix, what must change and what will stay. Set one all-in limit and keep a separate reserve.
- Project and household goal
- Must change / leave alone
- Total limit, allowances and reserve
- Timing, access and open approvals
Find the official approval guidance for your state before booking a start date.
2. Check the builder
Record the legal contracting name, licence or registration class and expiry, and verify the scope and insurance that apply.
- Builder, licence and day-to-day supervisor
- Insurance, references and unresolved checks
3. Compare two quotes
Give both builders the same brief. Use GST-inclusive amounts and keep any unpriced work as unknown, not zero.
| Compare | Quote A | Quote B |
|---|---|---|
| Quoted total incl. GST | ||
| Add exclusions you still need | ||
| Comparable total from known amounts | ||
| Allowances and unknowns | ||
| Start, duration and expiry |
- One question to ask before deciding
Follow one fictional kitchen from quote to change
- Plan: Improve the prep area, keep the plumbing and include removal and disposal in the quote request.
- Compare: One builder quotes A$32,000 including disposal and tapware. The other quotes A$29,800, but matching those two items adds A$2,600. That brings the second quote to A$32,400 on known items. Unpriced repairs still need a written answer.
- Record a change: After signing, the homeowner asks about blue splashback tiles instead of white. The sample shows A$220 extra including GST and one extra day. Don’t treat that price as accepted. In the demo, choose Try homeowner view and request a revision asking if removal and disposal are included.
- Review the answer: Switch back to the builder view, create a revised version, and try A$260 and one extra day with removal and disposal included. Switch back to see that the new version needs its own response. Download the decision record to see both versions.
Try the sample · Open the change worksheet for your own notes
Use fictional details only in the demo. It does not send, sign or approve work. Use your existing formal process before accepting any change.