How to compare two quotes for a renovation variation

Two quotes for the same renovation variation can look easy to compare until you notice that one includes removal, delivery or a credit for unused materials and the other does not. Put the differences in writing before you compare the totals.

Start here

Like-for-like means pricing the same work both ways, including things like installation and disposal.

Before you start: Start with both quotes and write the original job in one line. Circle anything that is included in one quote but missing from the other.

Compare the job you would actually get

  1. Choose a common baseline: same size, finish, installation, cleanup and tax treatment. Move any excluded but necessary work into a separate line; do not treat an unknown as zero.
  2. Record credits explicitly and classify each number as fixed or estimated. Write the timing as a separate row so a cheaper option does not hide a missed installation window.
  3. Ask both providers to confirm the scope and expiry in writing. If an estimate stays unresolved, carry it as a range rather than naming a winner.

Fictional example: a tiled splashback

Option A: A$1,460 incl. GST with removal and disposal.

Option B: A$1,230 incl. GST + A$280 removal and disposal = A$1,510, before any substrate repair.

A is A$50 cheaper on known items. Ask both whether substrate preparation is included and check their installation windows.

Check before you move on: Compare incremental totals against the same original scope. A lower base quote is not the same as a lower comparable price.

Build a like-for-like comparison

List the exact work each quote covers. For a fictional laundry bench change, Quote A includes removal of the original bench and disposal, while Quote B assumes the space is already clear. Confirm who is doing those tasks before putting both quotes side by side.

Add any exclusions you need to ask about. A blank is not the same as zero. Mark an item unknown if the supplier has not priced it.

Show credits separately from new costs

In the sample, Quote A lists A$840 for the replacement and a A$180 credit for the original bench that will not be supplied. Quote B shows A$650 but does not specify a credit. The first net cost is A$660. The second amount cannot safely be treated as A$10 cheaper until the scope and credit are clear.

Record whether GST is included, which figures are estimates, and when each quote will expire.

Treat time as a separate choice

Ask when the new material can arrive and which work depends on it. A quote with a lower cost may still affect other trades if the installation moves.

Use a RenoCue worksheet for each option, or record both against the same scope baseline. This helps the discussion; it is not a recommendation to choose the cheaper quote or permission to start work.

Copy this message before you choose

Hi, I am comparing quote [number or date] with another quote for the same change. Can you confirm the total including GST, whether removing and disposing of the old material is included, and any credit for work or material no longer needed? If the surface needs repair before installation, what would that add to the cost and time? Please let me know which amounts are fixed, when the quote expires, and the earliest installation date. I am asking for clarification, not approving the work.

If an amount is still unknown, keep it marked as unknown. Use the free printable RenoCue worksheet to keep each reply with the quote it refers to. No sign-up needed.

See the workflow in practice

See the RenoCue app screenshots. The example uses fictional information.

Related guides

Your next step

Follow one kitchen change through a question, revised price and a new response. Try the fictional case.