How to plan a home renovation in NSW
Start your first renovation with a one-page brief, a realistic budget and an approvals check. Includes a copyable example for NSW homeowners.
Start with the problem, not the finishes
Before picking tiles or asking for prices, walk through the room and write down what does not work. “Two people cannot use the kitchen at once” is more useful than “we want a modern kitchen”. Take room photos, note rough dimensions and mark what stays. Have your designer or builder verify measurements before anyone orders materials.
- Must have: List what the renovation needs to fix.
- Nice to have: List what you would drop to stay on budget.
- Not changing: Be explicit about walls, windows or plumbing that should stay put.
- Open questions: Write down what someone qualified needs to check, such as whether a wall is structural.
Make a budget for the whole job
Separate the building quote from design and engineering fees, approval or inspection costs, items you buy directly, temporary living costs and a reserve for surprises. Ask which amounts include GST and which are still estimates. Do not commit your reserve to upgrades before the unknowns are priced.
Fictional example: A household with an A$60,000 cap sets aside A$42,000 for building, A$5,000 for design and approvals, A$4,000 for appliances, A$2,000 for a temporary setup and A$7,000 for unknowns. These are illustration figures, not market prices or a recommended reserve.
Check approvals before booking a start date
In NSW, small jobs may be exempt only if the work and the property meet the rules. Other work may qualify for a complying development certificate (CDC), or need a development application (DA) and further construction approval. Ask your council or a registered certifier what applies to your address, and who books any required inspections. Mention walls, waterproofing, external work and any known heritage restrictions.
If you live in strata, read your by-laws and check what needs written approval from the owners corporation or its delegate. A kitchen or bathroom can need permission even when you are not changing the exterior. Strata permission is not a substitute for any separate planning or building approval.
Copy this one-page brief
Goal: [problem to fix]. Rooms and work: [what changes]. Keep: [what stays]. Must-haves and optional extras: [separate lists]. All-in budget: [cap and reserve]. Access and timing: [when, hours, stairs, parking, can we stay?]. Unknowns and approvals: [question, who will check, due date].
You are ready to approach builders when a second person can read the brief and describe the same job back to you.
General homeowner information. Approval, licensing and insurance details refer to NSW, Australia. Check the current rules for your address and scope before committing. Sources checked .
Other RenoCue homeowner guides
- How to find and check a renovation builder in NSW
- How to compare renovation builder quotes
- Builder, architect or owner-builder? A NSW guide
Use the free printable renovation change worksheet (no sign-up).
Your next step
Put your goal, budget and open checks on one sheet. Print the planning worksheet.